Check 3 of 4 · Site Checker

Check before factory-plan submission

Verify that the proposed factory-plan pack accurately reflects the site and agreed design before submission.

Site Checker must have before travellingYour responsibility · 7 items
  • Check type and scope confirmed before booking.

    More detail

    Know which of the four checks this is and which rooms or areas are included.

  • Latest issued revision only — no superseded drawings mixed in.

    More detail

    Check revision references match across every sheet in the pack.

  • Review the pack before travelling.

    More detail

    Missing critical information goes back to the consultant before attendance, or before the affected work proceeds.

  • Latest proposed factory plans, elevations and sections/details.

  • Revision list showing changes since the previous check.

  • Earlier measurement records and site photographs.

  • List of remaining approvals and uncertainties.

Site Checker on site: measure, inspect, mark, verifyYour responsibility · 7 items
  • Key dimensions against the site and previous measurement records.

  • Wall runs, heights, openings, bulkheads and finished-level assumptions.

  • Cabinet fit, fillers, scribes, panels, opening clearances and appliance spaces.

  • Service positions against the proposed factory plans.

  • Whether building changes have invalidated earlier measurements.

  • Whether earlier discrepancies were corrected throughout the pack.

    More detail

    Check every affected sheet, not only the one where the error was first found.

  • Areas not yet verifiable and assumptions affecting manufacture.

Photographs and measurements to captureYour responsibility · 4 items
  • Re-measured key dimensions recorded against plan references.

  • Photos of any area where conditions changed since the last check.

  • Photos of service positions relative to the planned cabinetry.

  • Unverifiable areas and manufacturing assumptions listed explicitly.

Matters requiring clarificationYour responsibility · 4 items
  • Differences between factory plans and site measurements.

  • Earlier corrections not carried through the whole pack.

  • Remaining client approvals or unconfirmed specifications.

  • Assumptions about finished levels or unfinished work.

Resolve before progressingYour responsibility · 5 items
  • The Site Checker identifies and returns discrepancies.

  • The design assistant revises the drawings.

  • The responsible consultant checks decisions and corrections are incorporated.

  • Recheck affected areas where necessary.

  • Follow TKS's authorised factory-release process.

Consultant providesDesign Consultant · 4 items
  • Final proposed design and confirmed client decisions.

  • Approved specifications and appliance details.

  • Previous site-check findings and agreed changes.

  • Clear identification of remaining approvals or uncertainties.

Design assistant preparesDesign Assistant · 6 items
  • Latest proposed factory plans, elevations and relevant sections/details.

  • Cabinet sizes and positions, fillers, scribes, end panels and finish details.

  • Appliance openings and manufacturer requirements.

  • Coordinated plumbing/electrical information.

  • A revision list showing changes since the previous check.

  • References to earlier measurements and site photographs.