Check 4 of 4 · Site Checker

Final pre-delivery / pre-installation check

Confirm the site is ready and identify changes that could prevent successful delivery or installation.

Site Checker must have before travellingYour responsibility · 7 items
  • Check type and scope confirmed before booking.

    More detail

    Know which of the four checks this is and which rooms or areas are included.

  • Latest issued revision only — no superseded drawings mixed in.

    More detail

    Check revision references match across every sheet in the pack.

  • Review the pack before travelling.

    More detail

    Missing critical information goes back to the consultant before attendance, or before the affected work proceeds.

  • Latest issued installation/factory drawings with revision identification.

  • Details of changes agreed since factory submission.

  • Appliance and specialist-item arrangements.

  • Known building dependencies and client commitments.

Site Checker on site: measure, inspect, mark, verifyYour responsibility · 9 items
  • Site dimensions and conditions have not materially changed.

  • Required building work, floors, walls and ceilings are sufficiently complete.

  • Plumbing, electrical and extraction points match coordinated requirements.

  • Walls and support conditions are suitable — specialist confirmation where needed.

  • Site is dry, secure, accessible and sufficiently clear for the work.

  • Delivery access, stairs/lifts, unloading and storage arrangements.

  • Appliance availability or reliable specifications needed for installation.

  • Outstanding work by other trades and its effect on the programme.

  • Changes affecting manufactured cabinetry.

Photographs and measurements to captureYour responsibility · 4 items
  • Room photographs showing current state of walls, floors and ceilings.

  • Photos of service points against the issued drawings.

  • Photos of delivery route, stairs/lifts and storage area.

  • Re-measured dimensions where conditions appear to have changed.

Matters requiring clarificationYour responsibility · 4 items
  • Incomplete building work or outstanding trades.

  • Service points not matching coordinated requirements.

  • Appliances unavailable or specifications unconfirmed.

  • Site changes affecting manufactured cabinetry.

Resolve before progressingYour responsibility · 3 items
  • Identify work that must be completed before delivery or fitting.

  • Refer readiness issues to the installation manager, consultant and office.

  • The relevant manager/office confirms programme changes and client communication.

Consultant providesDesign Consultant · 4 items
  • Latest issued installation/factory drawings.

  • Agreed changes after factory submission.

  • Confirmed appliance and specialist-item arrangements.

  • Known building dependencies and client commitments.

Design assistant preparesDesign Assistant · 3 items
  • Current issued drawings with revision identification.

  • Clear details of changes since the previous check.

  • Coordinated services information and relevant installation details.